In April 2011, a total of 600 tons of UOP MD tower trays for the xylene column at Sichuan Petrochemical were shipped out in successive batches.


Release Date:

2011-04-10

  In April 2011, a total of 600 tonnes of UOP MD tower trays for the xylene column at Sichuan Petrochemical were shipped in successive batches, with the destination being the Pengzhou construction site of Sichuan Petrochemical.